DESIGN PHASE: preliminary design SUB ELEMENT NAME: establish circuit requirements VARIABLE NAME: [HEPECR] DATE: REVISION LETTER: REVISION DATE: APPLICABILITY: all circuits ACTIVITY: Review baseline design requirements in proposal and contractual documents and validate/update based on discussions with lead engineer, responsible system engineers, and engineers working on interfacing circuits. Extend requirements and add design margins as necessary to define circuit that will be developed. OUTPUT: Report, Subject: Design Requirements, XXX Circuit, with advanced copy available at conceptual design review. This report shall be issued or counter signed by the responsible system engineer and updated as changes occur to accurately reflect requirements throughout the design cycle. Traceability to specified and derived requirements (and how derived) will be made explicit. (For example, requirement from system engineer may be 5V +/-5%, at 6.8A. Circuit requirement may be 5V +/- 3% at 8A to allow for design margin, growth, etc.) Letter will eventually be replaced by a requirements section in the final report. ALGORITHM: [HEPECR] = engineer hours to establish requirements 0.0+ set up time 0.1* time per part [PARTS COUNT]+ circuit parts count 0.0*( time per input/output [INPUT COUNT] number of inputs +[OUTPUT COUNT]) number of outputs DISCUSSION:
Original: Foutz, J., Power Supply Circuit Development Estimating Aid - An Expert System Application, IEEE Applied Power Electronics Conference Record, New Orleans, February 1-5, 1988. Revised 28 February 2001
Copyright © 2001 Jerrold Foutz
All Rights Reserved