DESIGN PHASE: preliminary activity SUB ELEMENT NAME: verify circuit concept VARIABLE NAME: [HEPVCC] DATE: REVISION LETTER: REVISION DATE: APPLICABILITY: all circuits ACTIVITY: Verify that the circuit concept in the base line design meets the current circuit requirements. OUTPUT: Validation of existing schematic (topology and parts type, but not necessary component values) and parts list, or generation of new schematic and parts list. ALGORITHM: [HEPVCC] = engineer hours to verify circuit concept 0.0+ set up time 0.0* time per part [PARTS COUNT] circuit parts count DISCUSSION:
Original: Foutz, J., Power Supply Circuit Development Estimating Aid - An Expert System Application, IEEE Applied Power Electronics Conference Record, New Orleans, February 1-5, 1988. Revised 26 February 2001
Copyright © 2001 Jerrold Foutz
All Rights Reserved